Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Manufacturer from China
Verified Supplier
4 Years
Home / Products / UV CIPP Lining /

UV Sewer Lining Ultraviolet Curing Process Trenchless Water Line Repair Urban DN740

Contact Now
Daoyunai Energy Saving Technology Limited
Visit Website
City:shanghai
Province/State:shanghai
Country/Region:china
Contact Person:MrAaron Wang
Contact Now

UV Sewer Lining Ultraviolet Curing Process Trenchless Water Line Repair Urban DN740

Ask Latest Price
Video Channel
Brand Name :DAO
Place of Origin :Jiangsu, China
MOQ :90m
Price :Variable
Payment Terms :T/T
Supply Ability :120 km per year
Delivery Time :15 working days
Packaging Details :Normal
Material :Fiberglass
Diameter :DN740
Thickness :8mm
Length :57.8m
Weight :Variable
Life :50 years
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

CIPP UV construction for urban pipeline repair via trenchless renovation

UV curing repair material selection:

The structure of all imported glass fiber + resin used for UV curing is divided from outside to inside: UV protective film, outer film, glass fiber fabric, and inner film (dragged out after curing).

UV curing repair method:

The structure of all imported glass fiber + resin used for UV curing is divided from outside to inside: UV protective film, outer film, glass fiber fabric, and inner film (dragged out after curing).

(1) Pipe pretreatment

The sewer before repair shall be blocked, pumped, and dredged, and a CCTV inspection shall be carried out before repair. Local cutting, plastering, grouting, and other auxiliary measures shall be added for serious defects.

(2) Pull in the bottom film and pull in the lining hose

The bottom film can reduce the drag resistance of the lining material, and also reduce the damage to the lining caused by the occasional protrusions on the inner wall of the original pipeline.

(3) Fixed tie

Fixing the binding head is a part of all UV curing processes that require high operator experience and proficiency. The binding head shall be firmly fixed to withstand the air pressure blown into the pipe by the fan during the curing process. Firstly, it is convenient for the installation of the lamp holder in the next step, and secondly, it ensures that the inner lining pipe is close to the original pipe wall.

(4) Feed-in lamp holder

According to different pipe diameters, the UV lamp holder is divided into four models: small, medium, large and extra-large. The repaired pipe diameter can cover all sizes of dn150-dn1600. Turn on the fan and air compressor to supply air into the pipe. After the inner lining pipe is inflated, quickly send the lamp holder into the pipe. Pay attention not to scratch the inner lining membrane.

(5) UV curing

After the lamp holder is jointed at the end, turn on the UV lamp to irradiate the inner lining pipe and start curing. Reasonably control the travel speed of the lamp holder to ensure that the curing process is completed at one time. The whole curing process is monitored, and automatically recorded, and the curing speed and pipe wall temperature are automatically recorded.

(6) Closeout

After curing, cut off the excess materials at the pipe end, remove the airbag and restore the water supply.

How CIPP No dig
Application Rainstorm
Length Any length is possible

UV Sewer Lining Ultraviolet Curing Process Trenchless Water Line Repair Urban DN740

Inquiry Cart 0