Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Manufacturer from China
Verified Supplier
4 Years
Home / Products / UV Cured CIPP /

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated

Contact Now
Daoyunai Energy Saving Technology Limited
Visit Website
City:shanghai
Province/State:shanghai
Country/Region:china
Contact Person:MrAaron Wang
Contact Now

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated

Ask Latest Price
Video Channel
Brand Name :DAO
Model Number :D919
Place of Origin :Jiangsu, China
MOQ :1 unit
Price :Variable
Payment Terms :T/T
Supply Ability :20 units per month
Delivery Time :25 working days
Packaging Details :Normal
Application :Sewer rehabilitation
Composition :Two Blowers, Cable, Video, Cure
Cable reel :150 meters
Power :Energy Saving LED
Range :DN200-1200
Color :Blank or printed as required
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Integrated CIPP UV repair equipment for private households and public pipelines

Pulling CIPP UV liner into the pipeline

1. Place the hoist on the wellhead to align the reel with the guide wheel, and the personnel at both ends can start the hoist to pull materials when they are ready.

2. During material delivery, ensure that the materials are folded neatly and are not scratched by foreign matters during material movement, especially at the wellhead and nozzle. (you can brush lubricant under the material to reduce the resistance of pulling the material).

3. The pulling speed shall be controlled within 5m/min.

4. If space permits, try to leave a certain distance between the steelhead and the pipe orifice to ensure that the finished incision is beautiful. When the material is approaching the end, do not pull too much, otherwise, it is very troublesome to pull the material backward. The hoist can be stopped when the material is pulled down to a proper position.

5. Remove the rope for pulling materials, rope tightener, lifting belt, universal shaft, and guide wheel, and put them back in the original place for next use. (when pulling the material, it is better to keep the material tight and observe whether the bottom film is pulled).

6. Repair the pipes of DN600 and below. The length of the two ends of the inner liner extending out of the original pipe is about ≥ 600mm. Repair the pipes of DN600 and above. The length of the two ends of the inner liner extending out of the original pipe is about ≥ 1000mm.

It depends on the site conditions.

Winch Required 5T
Speed Within 5m/min
Key points slowly and carefully

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public Integrated

Inquiry Cart 0