Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Manufacturer from China
Verified Supplier
4 Years
Home / Products / UV Cured CIPP /

Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair

Contact Now
Daoyunai Energy Saving Technology Limited
Visit Website
City:shanghai
Province/State:shanghai
Country/Region:china
Contact Person:MrAaron Wang
Contact Now

Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair

Ask Latest Price
Video Channel
Brand Name :DAO
Place of Origin :Jiangsu, China
MOQ :60m
Price :Variable
Payment Terms :T/T
Supply Ability :220 km per year
Delivery Time :15 working days
Packaging Details :Normal
Material :UV light
Diameter :DN500
Thickness :6mm
Length :360m
Weight :Variable
Life :50 years
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

UV cure product for urban pipes service and repair by no excavation process

UV CIPP curing trenchless repair:

UV curing uses UV light as the curing medium. The resin contains a photoinitiator. When irradiated by UV light of a specific wavelength, the resin will produce a curing reaction to form a new high-strength lined pipe. The installation method is mainly pull-in type, which is applicable to drainage pipes of various shapes with a pipe diameter of 150mm~1600mm. During construction, the windlass is used to pull the glass fiber inner liner filled with resin into the existing pipeline, and the inner liner is "blown" by a large flow fan, and then clings to the inner wall of the existing pipeline. After solidification, the pipeline can not rely on the original pipeline, and can independently bear internal and external pressure. The repaired new pipe will not affect the water flow section, and the normal service life is more than 50 years.

UV curing repair process:

(fixed binding head) (sent to lamp rack) (UV curing) (repaired pipe)

UV curing repair features and advantages:

◆ little impact on traffic, etc. Trenchless lining repair without excavation of work pit;

◆ good construction controllability and short construction period. The whole curing process is monitored by CCTV, and the pulling in and curing can be completed in only 3 to 4 hours;

◆ energy saving and high security. UV curing is adopted, with low energy demand. No water or steam curing is used at the construction site, and no toxic gas or other harmful substances are produced;

◆ the inner liner has a good sealing effect, strong corrosion-resistance, and long service life;

◆ high mechanical strength can be achieved under small thickness to reduce the current carrying loss of pipe diameter;

◆ high bending elastic modulus, bending, and tensile strength;

◆ many domestic and international authoritative quality certifications.

How CIPP
Application Storm
Length Any length is possible

Rehabilitation UV Cured CIPP Relining For Urban Pipes Repair Cipp Pipe Repair

Inquiry Cart 0