Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Manufacturer from China
Verified Supplier
4 Years
Home / Products / UV Cured CIPP /

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Contact Now
Daoyunai Energy Saving Technology Limited
Visit Website
City:shanghai
Province/State:shanghai
Country/Region:china
Contact Person:MrAaron Wang
Contact Now

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Ask Latest Price
Video Channel
Brand Name :DAO
Place of Origin :Jiangsu, China
MOQ :57 m
Price :Variable
Payment Terms :T/T
Supply Ability :330 km per year
Delivery Time :15 working days
Packaging Details :Normal
Material :Fiberglass saturated resin
Diameter :DN1000
Thickness :10mm
Length :115m
Weight :Variable
Life :50 years
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Fiberglass saturated resin installation for underground pipelines by no excavation

UV CIPP trenchless construction for sewer repair

At the same time as pulling the liner, the operator at the bottom of the inspection well shall be in place to assist the hose at all times to ensure that it is always at the bottom of the pipe without touching the top of the pipe.

If the material diameter is greater than or equal to DN600, it is recommended to apply grease or detergent water at the bottom of the material or above the bottom film to reduce friction.

At the same time, pay attention to the flatness of the material at all times to ensure that it is not knotted or bent. Otherwise, once the material enters the pipeline, it will be difficult to fully expand in case of winding, resulting in waste and economic losses.

At the end of the manhole section, the person responsible for dragging the bottom film and hose should use a hoist, which requires 3-5 tons.

Always pay attention to the safety of operators at the bottom of the manhole.

For the pipes below DN600, the lamp chain shall be used for curing, and the installation of the stainless steel tie at one end and the assembly of the lamp chain shall be completed on the ground.

For pipelines above DN600, the lamp holder shall be used for curing. If the manhole or wellhead is too small, the installation of stainless steel binding head and the assembly of the lamp holder shall be completed inside the pipeline.

When the hose is still 5 meters long, stop dragging and start to install stainless steel ties.

Function Trenchless repair
Application Cured-in-place-pipe
Length Any length is possible

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Inquiry Cart 0