Daoyunai Energy Saving Technology Limited

Committed to underground pipeline CIPP and CCTV

Manufacturer from China
Verified Supplier
4 Years
Home / Products / UV CIPP Equipment /

Steam Water UV CIPP Equipment Duct Relining NO-Digging Repair Underground Sewer Network

Contact Now
Daoyunai Energy Saving Technology Limited
Visit Website
City:shanghai
Province/State:shanghai
Country/Region:china
Contact Person:MrAaron Wang
Contact Now

Steam Water UV CIPP Equipment Duct Relining NO-Digging Repair Underground Sewer Network

Ask Latest Price
Video Channel
Brand Name :DAO
Model Number :D919
Place of Origin :Jiangsu, China
MOQ :1 piece
Price :Variable
Payment Terms :T/T
Supply Ability :500 pcs per month
Delivery Time :20 working days
Packaging Details :Normal
Application :Repair sewer
Diameter :DN1150
Length :77m
Brand :DAO
Material :Liner
Life :50 years
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

NO-Digging repair underground sewer network by high and new technology CIPP UV

Important items for UV construction

The number of personnel per shift:

It is suggested that there should be 10 persons, including one for overall process control, one for main equipment operation, and two for the bottom hole. Everyone should be proficient in the assembly of light chains, binding, binding, and other processes.

In addition, when dragging materials, there shall be one person at the bottom of the well, at least four at the beginning, and two at the end if there is a winch. If there is no winch, more manpower is required to pull materials.

In addition, the whole process can be controlled in about 6-8 hours from the completion of pretreatment to the completion of curing.

Jobsite needs:

1. One hoist of more than 3 tons, including steel wire rope of more than 150m. It is best to adjust the speed. The slower the speed cannot be adjusted, the better.

2. Light curing hose material, bottom film, binding cloth, and lamp film.

3. Ten 1.5-inch and two-inch ties respectively. Buy better and stronger tensioners.

4. Two small water pumps are used to pump water in the well chamber, or two Self-priming pumps.

5. Four interphones, two batteries for field communication.

6. Non woven fabric or thick carpet 3m*5m, laid on the ground to protect materials

7. Square timber 50-80cm, ready to be dried.

8. Several vises are used to fine-tune and fix materials at the bottom of the well.

9. Lifting lugs, 2 for towing materials.

10. One 750W axial flow fan is used for forced ventilation of the well chamber.

11. 4-angle grinders with several cutting blades. It is recommended to use compressed air power.

12. Two traction ropes of 8mm and more than 100m are used to drag the bottom film and steel wire rope.

13. Portable power distribution box is used to supply power to the axial flow fan, small water pump, angle grinder and well lighting fixtures.

14. Several respirators or respirators with filters and goggles.

15. There are several cotton gloves, which are only used for changing bulbs. There are several rubber gloves.

16. One section of the 10m air duct is equipped with a D65 fire connector, and two sections are prepared.

17. 10m hose with 1-inch air compressor connector and air release valve at the other end.

18. The steel pipe is 40cm long and 65cm long, with bearings inside at both ends. It is used to walk the steel wire rope when dragging materials.

19. Several rolls of plastic film are used to protect the stainless steel tie head.

20. More than 10 industrial art knives are used for cutting hoses.

21. Two small crowbars are used to tighten stainless steel ties.

22. Six LED headlights are used for bottom lighting.

How NO-DIGGING
Application Sewers and storms
QTY Any

Steam Water UV CIPP Equipment Duct Relining NO-Digging Repair Underground Sewer Network

Inquiry Cart 0